Jump to content
Mechanical Engineering

Drawing Requirement to Restrain for Inspection


ToddBoilerUp

Recommended Posts

I have a mechanical drawing for a machined component. The component is for a turbine engine and has very tight tolerances as well as GD&T requirements throughout. One of the notes states, "PART IS INSPECTED UNDER RESTRAINED CONDITION." The restraining conditions are not identified, such as calling out a datum.

What is intended by the engineer when this type of restraint is called out? Does this give total freedom to the inspection lab to define the surfaces to restrain? Does this require restrained to the 3 main datums?

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Join Mechanical Engineering network

    Join us (login) to get full access : Please sign up to connect and participate.

    To download files...please login

  • Who's Online   0 Members, 0 Anonymous, 9 Guests (See full list)






×
×
  • Create New...