Jump to content
Mechanical Engineering

surendhar77

Members
  • Content Count

    4
  • Joined

  • Last visited

About surendhar77

  • Rank
    Member

Profile Information

  • Gender
    Male
  • Location
    India
  1. Yeah, Great idea, but here we are goindg to use 3 to 6 number of straight line over the mother pipe. so we can avoid that issue. Here i want to what size to be lay over the mother pipe and how many straight line pipe?
  2. Actually we planned to implement electric heat tracing for bitumen handling pipe system. But our management proposed Pipe on pipe heat tracing system. So now problem is to finding 200 mtr long 12" carbon steel pipe carrying Bitumen product at 130 deg C. here we providing mineral wool insulation 50 mm.so we want to maintain these tempearture at the end of line. Min ambient temperature considered at site 0 deg C. To compensate the heat loss of pipe we are going to use pipe on pipe heat tracing method(Thermic fluid at 250 deg C). LIKE Above the mother pipe, one small pipe. Now problem how to fi
  3. i working in Oiland gas storage industry in project deparatment engineering dicision. Here my role is designing fire fighting system and cost estimation in addtion learning other engineering part like venting, painitng system,refrigeration system, Hot and cold insulation.
  4. HOW TO SIZE REQUIRED PIPE DIA FOR PIPE ON PIPE HEAT TRACING FOR MAINTAINING CHEMICAL TEMPERATURE? IS THERE ANY MEHTOD AVAILABLE?
×
×
  • Create New...